ItemDescription of Scope of workContract No & DescriptionNBWSCMain Contractor/Buyer/Government BodyConsultantYear
1Supply, design, fabrication & installation of Noise Enclosure and Noise barrier Reflective and Absorptive panel
1) Steel Structure
2) Sound reflective panel & Absorptive panel  
HY/2009/19
Sub contract:
SC-043 Central Wan Chai Bypass Tunnel and Island Eastern Connection Link
ApprovedChun Wo-CRGL-MBEC Joint VentureAECOM2014 Jan to 2022 Aug
2Supply, fabrication & installation of Steel and Street Furniture (Metal Works)
1) L3 railing
HY/2009/19
Sub contract:
SC-072 Central Wan Chai Bypass Tunnel and Island Eastern Connection Link
 Chun Wo-CRGL-MBEC Joint VentureAECOM2016 Feb to 2016 Nov
3Supply, fabrication & installation of Steel and Street Furniture (Metal Works)
1) TCSS Ducting
2) TCSS Pole  
HY/2009/19
Sub contract:
SC-083 Central Wan Chai Bypass Tunnel and Island Eastern Connection Link
 Chun Wo-CRGL-MBEC Joint VentureAECOM2017 Aug to 2019 Oct
4Supply, fabrication & installation of Steel and Street Furniture (Metal Works)
1) Stainless Steel Safety railing 
2) L3 railing
3) Thire Beam Barrier 
4) Type 2 railing  
CV/2012/09
Liantang and Heung Yuen Wai Boundary Control Point Site Formation and Infrastructure Works- Contract 3  
 Chun Wo Construction and Eng. Co. Ltd.AECOM2016 Jan to 2019 Sept
5Supply, fabrication & installation of Sign Gantries over the Highways
1) Sign Gantries
CV/2012/09
Liantang and Heung Yuen Wai Boundary Control Point Site Formation and Infrastructure Works- Contract 3
 Chun Wo Construction and Eng. Co. Ltd.AECOM2016 Jan to 2019 Sept
6Supply, design, fabrication & installation of Noise Enclosure and Noise barrier Reflective and Absorptive panel
1) Steel Structure
2) Sound reflective panel & Absorptive panel  
HY/2021/06
Retrofitting of Noise Barriers on Po Lam Road North and Po Ning Road, TKO 
ApprovedChun Wo-Kwan Lee Joint VentureMACL2021 July to present
 7Supply, design, fabrication & installation of Noise barrier
1) Steel Structure
2) Sound reflective panel
HY/2022/14
Modification Works of Noise Barriers along Yuen Long Highway near Park Signature
ApprovedHang Kee Development Company LimitedHYD2023 June to 2024 Jan
8Supply, design, fabrication & installation of Noise barrier
1) Steel Structure
2) Sound reflective panel & Absorptive panel
CV/2021/05
Infrastructure Works for Public Housing Developments at Long Bin, Yuen Long – Castle Peak Road (Ping Shan) and Long Tin Road
 China National Chemical Engineering Group Corporation Ltd - China Railway 15TH Bureau Group Corporation Ltd Joint VentureARUP2023 Apr to present
9Supply, design, fabrication & installation of Noise barrier
1) Steel Structure
2) Sound reflective panel & Absorptive panel  
MTR Tung Chung Line Extension Contract 1202
Tung Chung East Station and Associated Enabling Works for Track Diversions
 Paul Y. Engineering Group – China Railway Construction (HK) Ltd Joint VentureMTR2024 March to present